electrical wiring needs to be replaced, completion expected 7/20 - Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak - they will investigate 7/24 5. Grotto - Furniture — put back in grotto - Curtains — more curtains ordered — cream for the
uilding replaced - work to begin 7/18 EFTA00522045 - Painting — power sanding/rust removal continues — JE would like painting completed by 7/27 - Engineering Storage & Shelving — work started 7/13 — JE would like completed by 7/27 - Landscaping — quote for Sea grapes forwarded to JE 7/12 - awaiting direction - Landscaper(s
r Gold Lamps - electrical wiring needs to be replaced - COMPLETE - Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak - they will replace the piping 5. Grotto - Furniture — put back in grotto - Curtains — existing color not available — awa
Power sanding/rust removal complete - painting — COMPLETE - Engineering Doors — frames in place — doors hung — painting and caulking in progress - Engineering Storage & Shelving — must be completed by 8/14 - Engineering shed outer wall — in progress - Landscaping —Sea grapes transplanted per JE direction 7/30 - COMPLETE -
r Gold Lamps - electrical wiring needs to be replaced - COMPLETE - Fire pit — fix — a new propane tank was installed but it is now empty - Dann -id Brian suspect there is a leak - they will replace the piping — Danny to start on 8/15 — Danny will discuss with 6. Grotto - Curtains — existing color no
n up — in progress - per JE direction by 8/14 - Engineering Doors — frames in place — doors hung — painted and caulked — plaster work in progress - Engineering Storage & Shelving — COMPLETE - Engineering shed outer wall — COMPLETE 9. Triangle - - Peter transplanted 3 palms from engineering per JE directive 7/26 — COMPLETE 1
r Gold Lamps - electrical wiring needs to be replaced - COMPLETE - Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak - they will replace the piping 5. Grotto - Furniture — put back in grotto - Curtains — more curtains ordered — cream for t
l Shed concrete pad — COMPLETE - Metal Sheets - on old building replaced — COMPLETE - Power sanding/rust removal complete - painting in progress - Engineering Storage & Shelving — concrete wall repaired 7/27 - Landscaping — quote for Sea grapes forwarded to JE 7/12 - awaiting direction - Landscaper(s) to travel to Josephine
Entities connected to both Sergey Brin and Engineering Storage & Shelving

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Condoleezza Rice
PERSON
Samantha Power
PERSONDarren Indyke
PERSON
Oliver Stone
PERSON
Carlos
PERSONJules
PERSON
Zorro
LOCATION
Kawasaki
LOCATIONNanna
PERSONDarren & Rich
ORGANIZATIONJosephine
PERSONChillax Bathroom
PERSONMedia Room
ORGANIZATIONMacs Desktops & 1 Laptop
ORGANIZATIONBrice 7/24 -
ORGANIZATION
Coral Bay
LOCATION
Shields
PERSONCross Brackets & Robe Hooks
ORGANIZATION