4
Shared Docs
4
Same-Page
4 / 4
Mentions
electrical wiring needs to be replaced, completion expected 7/20 - Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak - they will investigate 7/24 5. Grotto - Furniture — put back in grotto - Curtains — more curtains ordered — cream for the
e furniture from 5 Palms once new 5 Palms furniture on site 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from facto
r Gold Lamps - electrical wiring needs to be replaced - COMPLETE - Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak - they will replace the piping 5. Grotto - Furniture — put back in grotto - Curtains — existing color not available — awa
om 5 Palms once new 5 Palms furniture on site — on site 8/3 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from facto
r Gold Lamps - electrical wiring needs to be replaced - COMPLETE - Fire pit — fix — a new propane tank was installed but it is now empty - Dann -id Brian suspect there is a leak - they will replace the piping — Danny to start on 8/15 — Danny will discuss with 6. Grotto - Curtains — existing color no
ide furniture from 5 Palms now that new 5 Palms furniture on site 16. Chillax Room — requires furniture piece for electrical/media equipment a 17. Chillax Bathroom - require blue rugs for bathroom & vanity area = 18. Mechanical Building - Replacement Transformer — estimated date to be shipped from factory (Il
r Gold Lamps - electrical wiring needs to be replaced - COMPLETE - Fire pit — fix — a new propane tank was installed but it is now empty - Danny and Brian suspect there is a leak - they will replace the piping 5. Grotto - Furniture — put back in grotto - Curtains — more curtains ordered — cream for t
e furniture from 5 Palms once new 5 Palms furniture on site 15. Chillax Room — requires furniture piece for electrical/media equipment — Sarah 16. Chillax Bathroom - require blue rugs for bathroom & vanity area — Sarah 17. Mechanical Building - Replacement Transformer — estimated date to be shipped from facto
Entities connected to both Sergey Brin and Chillax Bathroom

Jeffrey Epstein
PERSON
Marc Rich
PERSONLeon Black
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSON
Samantha Power
PERSON
Martha Stewart
PERSONLarry Visoski
PERSON
Oliver Stone
PERSON
Carlos
PERSONKaren
PERSON
White House
ORGANIZATIONJules
PERSONAnn Rodriquez
PERSONJermaine Ruan
PERSON
Kawasaki
LOCATIONJohn Deere
PERSONDarren & Rich
ORGANIZATIONJosephine
PERSONRichard Barnett
PERSON